I don't plan on going solar any time soon, but the actuators to lift the roof need powered. Its probably not the best solution, but here's what I plan on doing with the actuator wiring to go straight from the truck battery until I switch to solar (if ever). I'm using four 20 inch actuators.
Here's the diagram
Parts list
- Actuators
- Fuse Holder
- Double Pole Double Throw switch
- 12 gauge wire to and from the DPDT switch
- 16 gauge wire to and from each actuator
- Terminal Ring
